Approximately 10,500 tons of stone and debris were removed day and night to clear the way for the reconstruction work of the dock. We were hired by SSA, and the work was carried out at depths ranging from 12 to 22 meters, with a workforce of 20 divers.
The scope of the work included loading the platforms for the free disposal of materials in an area outside the dock.
We were hired to cut the dock using our diamond wire cutting equipment in a controlled manner to clear the way for the reconstruction work of the dock.
The concrete slabs, headers, and beams were cut in accordance with the procedures indicated by the supervision. The lifting maneuvers and removal of the cut elements were carried out, transporting them outside of the construction site.
Controlled demolition at the International Cruise Pier in Cozumel.
Construction of "Bubba Gump" Restaurant for SSA Mexico in Cozumel.
The construction of the "Bubba Gump" restaurant was carried out, and the works included foundation based on piles. Masonry, reinforced concrete beams and columns, 20 x 40 x 15 block walls, and intermediate slab work with joists and hollow bricks were also done. Additionally, the rooftop slab was constructed using double joists and polystyrene vaults.